Fertigation schedule for Thompson Seedless grafted on Dogridge
Growth stage
N (kg/ha)
P2O5 (kg/ha)
K2O (kg/ha)
April pruning (Back pruning)
Pre-bud differentiation (1-30 days)
80
__
__
Bud differentiation (31-60 days)
__
213.1
__
Post-bud differentiation (61-120 days)
__
__
80
October pruning (Forward pruning)
Pre-bloom (1-40 days)
80
__
__
Bloom set and shatter (41-70 days)
__
106.6
__
Berry growth up to veraison (71-105 days)
80
__
80
Veraison to harvest (106 days to harvest)
__
__
80
After harvest (Rest period » 20 days)
26.6
35.5
26.6
Total
266.6
355.2
266.6
By: Dr. J. Sharma and Dr. A.K. Upadhyay
- Login to post comments
- 1009 reads
